
Depending on shipping speed for each item, I should see these sometime between March and June. The complete PCs will likely go surface (1-3 months) due to their massive size while the smaller stuff I'll probably ship SAL. There's a nice mix of switches in these boards, anywhere from Alps, NEC Ovals, Cherry, and Fujitsu, as well as some others like Topre. A few domes as well that are cool like the Dreamcast board. Posting the auction images below to show what I should be expecting.
Not pictured: NEC PC-8801 MK II and NEC PC-9801 V.




















